BIM

What is it actually?

BIM is the design approach of the future.

Building Information Modeling (BIM) is a process which results in a three dimensional, integrated, data filled model that is important for all participants of the investment process: investors, contractors, designers and facility managers.
With BIM, you can plan and visualize the entire project during preconstruction. By immediate clash detection at the design stage, you can work efficiently and productively at every stage of the project lifecycle.

Interdisciplinary collaboration using BIM technology increase s project quality, enables more accurate cost estimation and scheduling.
It brings time and cost savings in the design and construction process.
BIM has now become the standard way of conducting a project and preparation of documentation. This is often an investors' requirement who see real benefits from using this technology.

We have a unique understanding of BIM implementation in all stages of investment: 2D, 3D, 4D, 5D, nD.
Take advantage of our offer and choose BIM today.

Our BIM Implementation includes
1

Providing standards based on the requirements and guidelines from the contractor, investor or the facility manager.

2

Preparing outline of the bim team structure.

3

Implementing standarization of BIM model components.

4

Implementing and managing CAD standards.

5

Advising on choosing the best software platform for the project.

6

Conducting trainings for the team on optimal use of BIM software and tools in the project.

7

Supporting the team in the execution of current project tasks.

8

Providing support and team mentoring on BIM processes and procedures through weekly Q&A sessions.

9

Performing quality check and control regarding BIM and cad standards on drawings and models.

10

Cooperating with engineers, designers and contractors on a daily basis.

Benefits of our BIM services

BUSINESS COMPETITIVENESS

Introduction of BIM in your design process increases your efficiency and enables you to make more profits. It allows you to compete for more contracts, especially premium ones.

PROJECT OPTIMIZATION

Using a central model enables collision free cooperation of all your designers and makes communication between engineers easier. Standardized 2D drawings are generated directly from that model which saves you time.

REDUCING ERRORS

Automatic collision analysis and model checks enable you to quickly identify and eliminate errors. By doing that you are minimizing the main source of delays and project costs.

VISUAL SCHEDULING

BIM 4D enables you to simulate all construction steps of the investment. You can easily plan all the construction phases and visualize the whole process, making it easier to understand and foresee any issues.

COST ESTIMATION

Generating BOQ and BOM directly from BIM 5D models is effortless, increases accuracy of cost estimation and makes preparation of queries to suppliers much easier.

FACILITY MANAGEMENT

BIM 7D enables facility managers to access all information about completed project, manage assets and the building remotely, without the need of getting out of their house.